Sign In | Join Free | My ecer.jp |
|
Brand Name : KANGBO
Model Number : Construction Material Hoist
Certification : TUV, CCC
Place of Origin : CHINA
MOQ : 1 set
Price : Negotiate
Payment Terms : T/T, L/C
Supply Ability : 150 sets per month
Delivery Time : 25-30 days
Packaging Details : Export package
name : Construction Material Hoist
Design : According to European Regulation
Doors : 3 Doors
Material : Q345B steel
Processing : Processed by CNC machines, robots
Color : Yellow Color
Yellow Color 3 Doors Construction Material Hoist
Construction Material Hoist Introduction
This product absorbs advanced technology at home and abroad, is novel in design, simple in operation and convenient to dismantle and repair. Its safety design and configuration is fully in conformity with national standards. It is mainly suitable for bridge, chimney, building and other high-rise building builders and cargo transportation, and can also be used in warehouses, wharfs and other places where vertical transportation needs to be used.
Optional Configuration
Rack and pinion elevator cage flap door as loading/unloading ramp.
Sliding Contact Line (Integrated Conductive Rail or Busbar) specially for rack and pinion lifts.
An intelligent elevator control system, Multi-function Control System, with functions of fault detect, display and alarm, and automatic cage landing/stop and floor selector, is available.
Automatic greasing machine for rack and pinion elevator is availble.
Technical Data
Item & Article No. | SC200BG, MP-B09; SC200/200BG, MP-B10 |
Payload Capacity | 2000 KG per Cage |
Lifting Speed | 0–60 m/min. |
Max. Lifting Height | 450 m |
Cage Size (internal) | 3.2(Length)*1.5(Width)*2.35(Height) Meter per Cage |
Cage Doors | 3 Doors, Entry Door + Exit Door + Side Door |
Motor Control | FC (Frequency Control) |
Engine Power | 2x23 KW per Cage |
Gearbox | Helical Gearbox |
Safety Device Type | Centrifugal Brake |
Power Supply Range | 380–500 V, 50 or 60 Hz, 3 Phase |
Type of Mast | Square Column 650*650 mm with Bolted Rack |
Length Mast Section | 1.508 m |
Rack Module | 8 |
![]() |
3 Doors Bridge 60 M / Min Construction Material Hoist Images |